A prefab build usually follows seven main stages: planning, design and engineering, permits, factory production, site preparation, delivery and assembly, and final on-site finishing. The home is built indoors while the site is prepared in parallel, which shortens the total timeline. Once delivered, assembly happens quickly often within days followed by inspections and the occupancy permit.