Steel construction is significantly faster, often shaving 30% to 50% off the total schedule. This speed comes from “parallel processing”: while your foundation is being poured on-site, the building’s steel components are simultaneously being manufactured in the factory. Once the kit arrives, the bolt-together assembly avoids the long curing times of concrete or the weather delays common with wood framing.