The project is delayed until proper stamped drawings are provided. This often requires hiring a Canadian engineer to review or redesign the structure, which adds both time and cost.
The project is delayed until proper stamped drawings are provided. This often requires hiring a Canadian engineer to review or redesign the structure, which adds both time and cost.