It’s possible for smaller, standard-spec buildings but it’s not the norm. After your engineering drawings are approved, plan for 8 to 14 weeks for fabrication and delivery. That clock starts after engineering sign-off, not after your first call. The fastest projects are those where the client comes prepared, approves drawings quickly, and has their site ready to receive the kit. If speed is your priority, tell us upfront we’ll design your spec to move as fast as possible.