Our Building Ordering Process

Planning and preparing for each aspect of your steel building project is important to ensure everything goes smoothly as it can.

Our Building Ordering Process

Planning and preparing for each aspect of your steel building project is important to ensure everything goes smoothly as it can.

1. Consultation

During the consultation, our building specialist will assist in designing your steel building. This includes determining size, location, accessories, and building requirements.

Following the consultation, you will receive a tailored quote with all the necessary details. We will recommend the best structure that meets or exceeds your needs and building concept.

2. Approval

Upon approval of the equation, it will be converted into a purchase order. You will receive this through Adobe Sign for your signature, along with the first 25% deposit invoice sent via email.

Once payment terms are met, we will begin drafting the preliminary engineer drawings. This will take approximately less than 3 weeks up to 12 weeks depending on the complexity of your steel building.

3. Production

During the production stage, our delivery team will confirm that you are ready to move forward, between 21 to 60 days before your specified delivery month.

Once we receive your drawing approval apposite, your steel building will enter production, where meticulous planning and attention to detail discussed throughout our collaboration truly come to fruition.

4. Delivery

During the delivery stage, we will promptly notify you with a tentative delivery window, so you can plan to receive your building and execute offloading.

While the primary responsibility for offloading typically rests with the customer, we are happy to lend our support and expertise to streamline this process.

1. Consultation

During the consultation, our building specialist will assist in designing your steel building. This includes determining size, location, accessories, and building requirements.

Following the consultation, you will receive a tailored quote with all the necessary details. We will recommend the best structure that meets or exceeds your needs and building concept.

2. Approval

Upon approval of the equation, it will be converted into a purchase order. You will receive this through Adobe Sign for your signature, along with the first 25% deposit invoice sent via email.

Once payment terms are met, we will begin drafting the preliminary engineer drawings. This will take approximately less than 3 weeks up to 12 weeks depending on the complexity of your steel building.

3. Production

During the production stage, our delivery team will confirm that you are ready to move forward, between 21 to 60 days before your specified delivery month.

Once we receive your drawing approval apposite, your steel building will enter production, where meticulous planning and attention to detail discussed throughout our collaboration truly come to fruition.

4. Delivery

During the delivery stage, we will promptly notify you with a tentative delivery window, so you can plan to receive your building and execute offloading.

While the primary responsibility for offloading typically rests with the customer, we are happy to lend our support and expertise to streamline this process.