Start by creating a stable building pad with proper grading and soil compaction. A foundation engineer will design the slab, footings, or piers based on the building’s load requirements and soil conditions. Anchor bolts must be placed accurately according to the manufacturer’s drawings, and concrete should be allowed to cure fully before erection begins.
