Most Canadian steel building projects take 6–9 months from first planning call to move-in. Every project follows the same rhythm: design, engineering, permits, production, delivery, and construction  and the earlier you start, the smoother the entire process becomes.Rushing any phase rarely saves time. It usually costs it.