Timelines vary, but most projects take 10–24 weeks from planning to move-in. Design and permits usually take a few weeks. Fabrication and delivery of the steel structure take several more. Once on-site, the steel frame goes up quickly often in 1–2 weeks. Interior work such as framing, plumbing, electrical, and finishes takes the longest. Simple designs finish faster than highly customized layouts.

Get a quote

Where did you first hear about us?