Prefab steel hangars can be installed up to 60% faster than traditional buildings. Because components are pre-engineered and manufactured off-site, most of the work happens before delivery. Once on-site, the labeled steel frames, panels, and doors fit together quickly, cutting construction time from several months to just a few weeks even in challenging weather. This faster turnaround helps owners protect aircraft and start operations sooner.