How much does a steel RV storage shed cost?

Costs vary based on size and design. A basic open shelter is the most affordable, while fully enclosed or multi-bay buildings cost more. Custom quotes are usually required for accuracy.

Does Metal Pro ship across Canada?

Yes. Metal Pro supplies steel roofing products to customers across Canada. Whether you’re building in British Columbia, Alberta, Ontario, or anywhere in between, we can get you the right materials. Lead times vary by product and location reach out directly for current availability and shipping timelines.

What pitch should a roof between two containers be?

The minimum pitch for steel roofing is generally 1:12. But for most Canadian climates anywhere that receives meaningful snowfall a pitch of 3:12 or steeper is strongly recommended. Steeper pitch means better snow shedding, fewer ice dam issues, and longer panel life. Low-slope roofs aren’t impossible, but they require specific panel profiles and additional detailing […]

How much does a steel roof for a container span cost in Canada?

Costs vary based on span width, panel profile, gauge, and total square footage. As a rough ballpark, most container roof projects fall somewhere between $3,000 and $15,000 CAD for materials : wider spans, heavier gauges, and more complex profiles sit at the higher end. The best way to get an accurate number is to get […]

Can I use regular corrugated metal roofing to span between containers?

 Yes , with conditions. Standard corrugated panels can work well for shorter spans in moderate snow zones, provided your gauge and purlin spacing are appropriate. For wider spans or heavier snow loads, a deeper rib profile like an R-panel or standing seam will outperform standard corrugated. The panel alone isn’t the whole answer, the framing […]

Do I need a building permit to put a roof between two shipping containers in Canada?

 In most Canadian provinces, yes. Any permanent roofed structure is generally subject to local building permit requirements. Rules vary by province and municipality; rural properties sometimes have more flexibility, but that’s not something to assume. Check with your local authority having jurisdiction (AHJ) before you build. Getting caught without a permit after the fact is […]

What is the maximum span for steel roofing without structural support?

As a general rule, most steel roofing panels can span up to 8ft to 12ft without additional structural support  provided purlin spacing, gauge, and profile are correctly matched. Beyond 12ft, engineered framing becomes increasingly important. Beyond 20ft, a structural ridge beam or steel frame is typically required. The honest answer is that “maximum span” depends […]

What’s the typical cost difference between bolt-up and weld-up systems?

Weld-up buildings are typically more economical upfront since no engineer stamp is provided from the manufacturer. However, those initial material savings are offset when you consider the entire project’s lifetime. Weld-up repairs and routine maintenance are much more expensive and labour-intensive in the long run.  When you factor in certified welder rates, weather delays, permitting […]